How to prevent corrosion of overhead crane
After the bridge crane is transported from the workshop to assembly and acceptance, it begins to enter the wear stage. It is a slow process. The surface oxidation of the crane is the most obvious. Therefore, workers need to maintain equipment frequently to remove external dust and prevent corrosion. When it is rainy in summer, a layer of oil film can be sprayed on the surface of the bridge crane to isolate the humid air.


related article
> Our Electric Lifting Crane Factory
> What is the difference between a straddle carrier and a gantry crane?
> rubber tyred gantry crane function
> The electric transfer cart ordered by Russian customers has been shipped
> What is a transfer cart?
> How does a launching gantry work?
> overhead crane operation safety rules
> How many containers can a crane unload?